puff(er) daddy
Member
It finally came and I must say I'm not disappointed. The transition went great and I love the new look.
Now I would like to know if it's alright to mix the l/s up with the existing sand? And if so how long should I wait to do this? I want to get a constent look and by me adding three different brands of sand(l/s,SD, and sand from the lfs) I can see layer by layer.
So if so tell me how long should I wait.
Now I would like to know if it's alright to mix the l/s up with the existing sand? And if so how long should I wait to do this? I want to get a constent look and by me adding three different brands of sand(l/s,SD, and sand from the lfs) I can see layer by layer.
So if so tell me how long should I wait.