Whatsupdoc i seen that you had drawn up a plan for flukes and was wondering what the purpose of putting a pipe from the return back to the first chamber of the sump was
Diverts any flow that may be too much for the OF's to handle back through the sump. To be further processed. As opposed to just throttling the pump back.