54 is Up...

squidd

Active Member
Here's the "plumbing" before I finished the black acrylic overflow...
Bottom was tempered so I had to go through the side..."Durso" goes to sump/fuge in basement...Prefiltered one is intake for closed loop SCWD...I'm going "Bare Bottom" so return comes out on the bottom behind the rockwork...blows detrius toward the front where I can siphon it out...
Rock work is set kinda "hollow" underneath I can actually see/feel the current coming out the front...:D
 
Top