Plumbing

I am getting a t4 which is like 1800 gph (i know the swcd would hold that much but with head it should be alright) Of course i am trying to get as much flow as i can. DOes it matter how long your 3/8 tubbing is before the swcd or after the swcd. Humm let me see if this helps should i try to get as little 3/8 inch tubing as i can or does it matter??? If you have a pipe that is a inch on the other side of 3/8 hole does the inch of pipe on the other side do you any good? Does this make sense
:hilarious
 
Top