No pumps, I need those for the new 250.
It will just be the tank. (Stand and hood if you want them)
The overflows contain the original Oceanic parts, drain pipe with sponge pre-filter, and return pipe with lock-line in to tank.
This is all dependent on IF I get the wifes OK on the new 250. I'm 99% there and should be ordering the new tank this week for late Aug delivery. If the 110 is sold, it won't be ready to go 'till Late September.