rrcjr1972
Member
I am plumbing my sump to add a in line chiller. My over flows are rated for 600 gph each. the chillers max gph flow rate is 1200. If I use the 1200 gph iwaki external pump. Can I go from pump to chiller, then chiller to corner over flow returns and still keep up with over flows? I will be using 1" pvc to plumb to sump and 3/4" to chille then return. What I am trying to figure out is 1200 gph enough to go through chiller and 90 elbows with 3ft head room?