After about 12 hours on the canopy today, we've got it mostly done. Just left with the front doors, adding a couple 12v. fans, and a relay to automate the fans and moonlights. We wire the canopy with 8 receptacles on top to accomodate the 6 ballasts that will be installed when all the lighting is complete. So clown101 will have the ability to create a more natural photoperiod with just 7 (counting moonlight) timers. Turning on one set of lights at a time, then turning them off in the same order, ending back with actinics. Then when the last set of actinics goes off, fans shut down and moonlight's come on. He'll also be able to plug in the 2 koralia 4's and his aqualifter for the OF.Heres a few pics.
The first is how we cut the louvres in the two sid epanels with a table saw.
Second, I believe are the louvres cut .
Third, 6 retro's all fitted perfectly in place(barely I might add!).
Fourth, assemble the current 3 for the left side, with holes predrilled for the future installation.
Fifth, wiring mostly coplete.