foxthorn
Member
I want to add a bulkhead for a 2inch PVC pipe into a rubbermaid stock tank (trough). It is one of the 100 gallon tanks and I want the bulkhead up high so it can overflow into a lower and smaller tank.
My question is: These stock tanks are oval in shape and I'd like to add the bulkhead to one of the short (curved) ends. Has anyone added one at this location before? Is the curve gradual enough that the bulkhead still seals well?
THANKS!
My question is: These stock tanks are oval in shape and I'd like to add the bulkhead to one of the short (curved) ends. Has anyone added one at this location before? Is the curve gradual enough that the bulkhead still seals well?
THANKS!