biggredd
Member
So I have everything I need except the rock. Everything. (I think). My plan was to put the rock in and add the sand in after that. I have the sand. But in the meantime of trying to find a good deal that won't break me on the live rock (that stuff gets expensive) can I add the water to get it going? Or is it pointless to start until I am able to add the rock and sand? I've been prepping for 3 months now and am finally to the point. I am assembling the plumbing to my sump now but that won't really take very long (yeah right!!).
Also, I ordered a refractometer and it doesn't come with instructions. I haven't really looked around for how it work yet but was wondering if someone could give me a quick and dirty of how I make it work.
Also, I ordered a refractometer and it doesn't come with instructions. I haven't really looked around for how it work yet but was wondering if someone could give me a quick and dirty of how I make it work.