townsdp
Member
My last sump and fuge didn't use baffles and was just 2 rubbermaid tubs joined by bulkheads. I'm redoing my system draining my 75g drilling a corner sump draining through a 1" bulkhead. I acquired a 55g AGA that Im building into my new stand. I have drawn a design for it and am ording the glass baffles cut monday. It will have single drain, then the sump area with 200w heater, css125 skimmer, phosban reactor, then bubble trap baffles, 4" dsb fuge , then returned through mag 5 and mag 2 side-by-side running into same 3/4" return line into DT. I want to maintain a 13" water line pretty much so if anyone has any suggestions or sees any potential problems please let me know. Thanks