Hi, Tank is on a stand , Floor joist are perfectly capable of holding load and then some. Had carpenter here today he says jacking up floor will cause more problems. As the wall running paralel with tank is bearing it cause more damage than good. So as I see it I have 2 choices shim stand or relocate,I like tank in this room. With that said could someone tell me how to properly shim the stand so as to prevent disaster later on. We are actually out 3/4" over all just enough to make it a PITA.
Thanks John