drm100
Member
Hi first time posting but have been lurking for quite awhile lol. I have a question about my mixing station build. I have 4 55 gallon drums i'm using, 2 for ro water the other 2 for salt. my question: if i connect both ro water drums with a bulkhead near the bottom of each and pvc will they both fill with my ro line in the first drum? I am thinking they would fill together equally but before i make any holes I'd like to be sure. thanks for any help you can give me.