Updates...:
*Got electrical and lights all done in canopy.
* Have two out of the 4 baffels done for the sump.
* Got the outlets almost done. Just need to cut some heavy duty extension cord and wire it to it and then done.
*Tank is all painted
* Stand is coated with polyourathain to seal and protect it.
Still needs to be done.
* More silicon for baffels for sump/refuge. Probably 4-5
**Drilling*** Need tank to be drilled. 4 holes got bulkheads for each of them.
2x 1" 2x 1/2"
* Plumbing. Can't do this untill tank is drilled.
* Refuge light. Cut cord off old powerhead and wire.
* Cut hole in stand for U.V top to go through and possibly one for overflow pipe.
* Remove back support to put sump in. Then reattach it.
Think that is it. Comments?