if u add sand do only about a 1/4 inch at a time that is what i did to get my sand to a 4 inch level do about a 1/4 a week till u get it to what u want i would have between a 4 and 5 inch sand depth and u can add rock as u want i have about 120 pounds in mine with some of it as base rock under...